21.05°C Vancouver

Jul 24, 2025 6:43 PM - Connect Newsroom

Construction starts on new BC Cancer centre in Kamloops

Share On
construction-starts-on-new-bc-cancer-centre-in-kamloops
The centre is being built at the Westlands site at Royal Inland Hospital in Kamloops. (Photo - shared by minister Bowinn Ma on X)

Construction has begun on a new BC Cancer centre in Kamloops that will provide people in the Thompson-Cariboo-Shuswap region with better access to cancer care closer to home.

"This new BC Cancer centre in Kamloops is the single largest capital investment into the expansion of cancer care in the Kamloops region,” said Bowinn Ma, Minister of Infrastructure. “By building a facility equipped with the latest technology designed to meet the growing treatment needs of patients in the area, we're helping more people have access to high-quality cancer care closer to home. This project is part of our broader commitment to strengthening health-care infrastructure across the province.”

The centre is being built at the Westlands site at Royal Inland Hospital in Kamloops.

Chemotherapy is available at Royal Inland’s community oncology network clinic in Kamloops. Currently, patients travel to Kelowna or the Lower Mainland for radiation treatment. At the new centre, radiation treatment will be provided in shielded treatment rooms with three high-energy radiation treatment linear accelerators (LINACS).

Once the cancer centre opens to patients in 2028, it is expected to host 7,500 patient radiation consults and follow-up appointments annually. In its opening year, the centre is expected to provide approximately 16,500 treatments for up to 1,200 patients. This will save patients and their families time, stress and the burden of long-distance travel during care.

“The new BC Cancer centre in Kamloops is about delivering life-saving care closer to where people live, and to their loved ones and support networks,” said Josie Osborne, Minister of Health. “When people can access care closer to home, we know it leads to better experiences and healthier outcomes. This centre is a vital step toward ensuring people in the Thompson-Cariboo-Shuswap region receive timely, high-quality cancer care, when and where they need it most.”

The new BC Cancer centre will include:

  • radiation therapy planning including a computerized tomography scan (CT) simulator;
  • diagnostic magnetic resonance imaging (MRI);
  • an outpatient oncology ambulatory care unit, including exam rooms and consult rooms;
  • an interfaith sacred space for for patients, caregivers and staff to recuperate and recharge;
  • staff support, including offices and workstations; and
  • a 470-stall parkade.

The project also includes expansion and upgrades to Royal Inland’s community oncology clinic and pharmacy.

EllisDon Corporation has been selected to lead construction. Upgrades to the existing oncology clinic will continue, with work scheduled to finish at that site in 2029.

The new facility will be operated by BC Cancer in partnership with Interior Health. The estimated cost of the project is approximately $386 million, shared between the Province and the Thompson Regional Hospital District.

Royal Inland Hospital is one of two Interior Health tertiary referral hospitals, providing care for people in the Thompson-Cariboo-Shuswap region. It offers services including emergency care, surgeries, mental-health support, medical testing, cancer care and outpatient clinics.

The new BC Cancer centre is part of B.C.’s 10-Year Cancer Action Plan, which sets out immediate steps to improve prevention, detection and treatment of cancer.

Latest news

mission-rcmp-seize-firearms-issue-tickets-during-crackdown-on-illegal-shooting-along-forest-service-road
BCJun 18, 2026

Mission RCMP seize firearms, issue tickets during crackdown on illegal shooting along forest service road

Mission RCMP say officers seized multiple firearms and issued several violation tickets during an enforcement operation targeting illegal recreational shooting along the Lost Creek Forest Service Road area over the June 13–14 weekend. According to a Mission RCMP release, officers responded to a report on June 13 of people shooting near the 7.5-kilometre marker of the forest service road. Police located five men from Abbotsford and seized five firearms from two 21-year-old gun owners. The pair later received $690 violation tickets for discharging firearms in a designated no-shooting area. RCM
BCJun 18, 2026

Suspect Arrested in Langford Sexual Assault Investigation Involving Youth

West Shore RCMP say a 33-year-old man has been arrested in connection with a sexual assault investigation involving a youth in Langford. According to an RCMP release, the incident was reported to have occurred on June 9 at about 3 p.m. near the intersection of Jacklin Road and Station Avenue. Police said a female youth was approached by an unknown adult male at a bus stop, where a brief conversation took place before the youth was allegedly sexually assaulted. West Shore RCMP issued a public appeal for assistance on June 12 as investigators worked to identify the suspect. Police said officers
CanadaJun 18, 2026

IRCC pauses final processing of some citizenship cases approved under Bill C-3

Immigration, Refugees and Citizenship Canada (IRCC) has temporarily paused the final processing of some citizenship cases approved under Bill C-3, commonly known as the "Lost Canadians" legislation. According to IRCC, several dozen individuals have received notices asking them to surrender citizenship certificates that had already been issued while the department reviews their files. The department says the affected cases are undergoing additional document verification. In a statement, IRCC said individuals who have already received citizenship certificates and moved to Canada may continue to
b-c-launches-hydroelectric-upgrades-aimed-at-boosting-power-supply-by-7
BCJun 18, 2026

B.C. launches hydroelectric upgrades aimed at boosting power supply by 7%

The British Columbia government has announced a series of upgrades to its hydroelectric system that it says will increase the province's electricity supply by about seven per cent. Energy Minister Adrian Dix said the largest project will involve adding a sixth generating unit at the Revelstoke Dam, increasing capacity by approximately 500 megawatts by 2032. According to the provincial announcement, the first four generating units at the Revelstoke generating station will also undergo modernization work. The government said upgrades are also planned at six other generating stations and at the W
smith-says-timing-may-prevent-coal-mining-referendum-question-from-appearing-on-october-ballot
AlbertaJun 18, 2026

Smith says timing may prevent coal mining referendum question from appearing on October ballot

Alberta Premier Danielle Smith says it may be too late for a citizen-led petition seeking a ban on new coal mining projects to be included in the province's Oct. 19 referendum vote. Earlier this month, Alberta musician Corb Lund submitted what he said were more than 200,000 signatures in support of a petition that would require the Alberta government to consider legislation banning new coal mining or submit the matter to a provincewide referendum if the signatures are verified. According to Alberta's citizen initiative rules, a successful petition can compel the government to either introduce

Related News